BID PROPOSAL
WORKSHEET |
|
|
|
|
| |
CHAPEL
STREET RECONSTRUCTION - |
|
|
|
|
| |
JANUARY 2008 |
|
|
|
|
| Item |
DESCRIPTION |
APPROX. |
UNIT |
|
| No. |
|
QTY. |
UNIT |
PRICE |
TOTAL |
| 1 |
MAINTENANCE AND
PROTECTION OF TRAFFIC |
100% |
LS |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 2 |
POLICE TRAFFIC
DIRECTORS |
60 |
MAN HRS |
$65.00 |
|
| |
Write Lump Sum: |
|
|
|
|
| 3 |
BITUMINOUS CONCRETE
SURFACE COURSE, MIX I-5 |
220 |
TONS |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 4 |
BITUMINOUS
STABILIZED BASE, MIX I-2 |
100 |
TONS |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 5 |
DENSE GRADED
AGGREGATE BASE COURSE |
150 |
C.Y. |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 6 |
MILLING, 2"
THICK |
2,300 |
S.Y. |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 7 |
ROOF DRAINS, (SDR
35) |
200 |
L.F. |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 8 |
RESET CASTINGS
(MANHOLE / INLET) |
7 |
EACH |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 9 |
CONCRETE SIDEWALK,
4" thick |
400 |
S.Y. |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 10 |
CONCRETE DRIVEWAY
APRON, 6" thick |
150 |
S.Y. |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 11 |
DRIVEWAY RESTORATION, MIX I-5 |
150 |
S.Y. |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 12 |
GRANITE BLOCK CURB |
1,500 |
L.F. |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 13 |
SAW
CUTTING |
1,500 |
L.F. |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 14 |
UNCLASSIFIED ROADWAY EXCAVATION |
300 |
C.Y. |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 15 |
SELECT BACKFILL |
100 |
C.Y. |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 16 |
TRAFFIC STRIPING (
STOP BAR, DOUBLE, XWALK) |
250 |
L.F. |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 17 |
LANDSCAPE RESTORATION |
100% |
L.S. |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 18 |
REINF. CONCRETE
PIPE 15 IN. DIA |
100 |
L.F. |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 19 |
DRAINAGE INLET B TYPE |
4 |
EACH |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 20 |
DRAINAGE MANHOLE (DOGHOUSE) |
2 |
EACH |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 21 |
DUCTILE IRON PIPE,
8" DIA., CLASS 52 |
720 |
L.F. |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 22 |
GATE VALVE
(8") |
3 |
EACH |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 23 |
WATER SERVICE
CONNECTIONS, 1 INCH |
12 |
EACH |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 24 |
CORPORATION STOP, 1
INCH |
12 |
EACH |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 25 |
FIRE HYDRANT ASSEMBLY |
1 |
UNIT |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 26 |
TREE REMOVAL (12-24
INCH DIA) |
1 |
UNIT |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 27 |
TEST PITS |
50 |
C.Y. |
|
|
| |
Write Lump Sum: |
|
|
|
|
| WRITE
TOTAL WORKSHEET COSTS FOR PROJECT |
|
|
|
|
| |
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|