| |
BID PROPOSAL
WORKSHEET |
|
|
|
|
| |
2007 WATER MAIN REPLACEMENT |
|
|
|
|
| |
JANUARY 2008 |
|
|
|
|
| Item |
DESCRIPTION |
APPROX. |
UNIT |
|
| No. |
|
QTY. |
UNIT |
PRICE |
TOTAL |
| 1 |
MAINTENANCE AND
PROTECTION OF TRAFFIC |
100% |
LS |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 2 |
POLICE TRAFFIC
DIRECTORS |
300 |
MAN HRS |
$
65.00 |
$
19,500.00 |
| |
Write Lump Sum: |
|
|
|
|
| 3 |
BITUMINOUS SURFACE
COURSE, MIX I-5, 2 INCH |
120 |
TONS |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 4 |
BITUMINOUS
STABILIZED BASE, MIX I-2, 8 INCH |
1,350 |
TONS |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 5 |
DENSE GRADED
AGGREGATE BASE, 6 INCH |
3,350 |
S.Y. |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 6 |
SAWCUTTING |
12,500 |
L.F. |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 7 |
MILLING (2 IN DEPTH) |
2,200 |
S.Y. |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 8 |
UNCLASSIFIED ROADWAY EXCAVATION |
2,000 |
C.Y. |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 9 |
SELECT BACKFILL (IF & WHERE DIRECTED) |
1,600 |
C.Y. |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 10 |
DUCTILE IRON PIPE, 8" DIA., CLASS 52 LINED |
6,280 |
L.F. |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 11 |
GATE VALVE (8"
DIA) |
26 |
EACH |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 12 |
DUCTILE IRON PIPE,
10" DIA., CLASS 52 LINED |
100 |
L.F. |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 13 |
GATE VALVE
(10" DIA) |
4 |
EACH |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 14 |
DUCTILE IRON PIPE,
12" DIA., CLASS 52 LINED |
100 |
L.F. |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 15 |
GATE VALVE
(12" DIA) |
2 |
EACH |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 16 |
WATER SERVICE
CONNECTIONS, 1 INCH |
131 |
EACH |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 17 |
CORPORATION STOP, 1 INCH |
131 |
EACH |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 18 |
FIRE HYDRANT ASSEMBLY |
40 |
UNIT |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 19 |
ABANDON WATER MAIN |
100% |
L.S. |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 20 |
RESET WATER VALVE |
32 |
EACH |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 21 |
MISC. BENDS, REDUCERS, CLAMPS, RODS ETC. |
120 |
EACH |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 22 |
TEST PIT |
500 |
C.Y. |
|
|
| |
Write Lump Sum: |
|
|
|
|
| 23 |
LANDSCAPE RESTORATION |
100% |
L.S. |
|
|
| |
Write Lump Sum: |
|
|
|
|
| |
WRITE TOTAL PRICE FOR WATER MAIN REPLACEMENT |
|
|
|
|
| |
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|