| M A D I S O N P U B L I C S A F E T Y C O M P L E X | |||||||
|
|
|||||||
|
|
|
||||||
|
MARCH 15, 2006 (ABOVE) MARCH 15, 2006 (LEFT) |
|||||||
|
|
|
||||||
|
MARCH 24, 2006 (ABOVE & RIGHT) Workers are shown utilizing a concrete pumping truck to deliver concrete for the basement floor. |
|||||||
|
APRIL 4, 2006 (ABOVE) Madison Electric Utility lineman, David Artiglere is shown working on relocating high voltage power lines. |
APRIL 7, 2006 (ABOVE) A wooden stairway is constructed to provide workers easy access to the basement. |
||||||
|
APRIL 10, 2006 (ABOVE) Masons work on completing the footings for the front of the fire apparatus room. |
APRIL 17, 2006 (ABOVE) A worker is shown utilizing a piece of equipment to compact soil around the outer walls.
|
||||||
|
APRIL 17, 2006 (ABOVE) Masonry footings are approximately 80% complete.
|
|||||||
|
MAY 1, 2006 (ABOVE) Eight flatbed tractor trailer arrive in Madison with the Steel. The steel is off loaded with the crane shown above. |
|
||||||
|